Contract

OPTIMIZING CONTRACTS MANAGEMENT: A COMPREHENSIVE PRACTICAL STUDY FOR STRATEGICAL, SUPER FAST-TRACK PROJECTS

Master: Contract, claim and delay management in construction works Author: Eng. Mahmoud Abdelwahed Supervisor: Eng. Giovanni Franchi   1.1 Introduction Nowadays with the current dynamic expansion of construction project management, the effective administration of contracts, claims and delay management, and advanced projects management plays a vital role in assuring the project’s success. This thesis highlights […]

Contract

Case Study: The Construction of a Wastewater Conveyor in Saudi Arabia

Author: Raquel Macedo Moreira Tutor: Ing. Giovanni Franchi Master: Contract, Claim and delay management in construction works, a.a. 2022/23   This master thesis delved into one noteworthy challenge encountered during a high value construction project in Saudi Arabia for the construction of a wastewater conveyor tunnel. The project consisted of the employment of a double […]

Contract

STRATEGIA CONTRATTUALE PROGETTI DATA CENTER, CASO STUDIO DATA CENTER IN GLAND (VD) SVIZZERA

AUTORE: Ing. Maria Mihaescu TUTOR: Prof. Ing. Giovanni Franchi INTERNSHIP: Studente lavoratore MASTER: Master in “Contract, Claim and Delay Management in Construction Works” a.a 2022/2023 L’obiettivo della tesi di Master è quello di esplorare, attraverso il caso di studio “Data Center in Gland”, la formulazione di una strategia contrattuale completa, specifica per la dinamica e […]

Contract

INTEGRATING PROJECT MANAGEMENT AND CONTRACTUAL STRATEGIES FOR THE ENHANCEMENT OF SPECIAL AIRPORT SYSTEMS

AUTHOR: Jishad Cheenikka Parambu TUTOR: Eng. Giovanni Franchi MASTER: Master in “Project and Contract Management in Construction works” a.a 2022/24   This master thesis comprehensively analyzes SAS (Special Airport Systems) integration in terms of its function and influence on airport performance. The emphasis is mainly on key systems, including ILS (Instrument Landing Systems), advanced meteorological […]

Contract

A CASE STUDY: THESIS ON THE CLAIMS OF THE CONTRACTOR OF THE WATER SUPPLY AND WASTEWATER SYSTEM OF THE SLATINA AGGLOMERATION PROJECT

AUTHOR: Eng. Mehmet Ali ALTIOK (ID:10943125) TUTORS: Eng. Giovanni Franchi MASTER: Contract, claim and delay management in construction works INTERNSHIP: Ersa Construction Co. Uk   Project Overview Slatina infrastructure project contains 66km gravity corrugated pipelines, 57km PE pressure lines, 5.6km rehabilitation of the existing lines, 1.000m3 water tank construction, home connections, drainage lines, roads, walkways, […]

Contract

A CASE STUDY OF AN INFRASTRUCTURE PROJECT IN CENTRAL ASIA

AUTHOR: AYDIN GÜNLER TUTOR: Eng. GIOVANNI FRANCHI INTERNSHIP: N/A MASTER: Master in “Project and Contract Management in Construction Works” a.a 2022/2023   An infrastructure project implemented in Central Asia namely in Republic of Uzbekistan which is funded by one of international finance corporations (IFC) is analysed as a case study considering the problems encountered during […]

Contract

CONTRACTOR EVALUATION FOR EOT ENTITLEMENT FOR REFINERY PROJECT

Author: Khalil Badarneh Tutor: ing. Giovanni Franchi Internship: Tecnimont Master: Master in “Contract, Claim and delay management in construction works” a.a 2022/23   This thesis discusses the hindrance the contractor experienced during the beginning of the project which involves enhancing two refiners that have been built in 50s and 70s. the impediment is attributable to […]

Contract, PROJECT MANAGEMENT

IL DESIGN FOR MANUFACTURING AND ASSEMBLY (DFMA) COME APPLICAZIONE DI UN PROCESSO LEAN ALLA PROGETTAZIONE DI COSTRUZIONI IN LEGNO.

AUTORE: Mario Busolli TUTOR: Ing. Giovanni Franchi MASTER: Master in “PROJECT AND CONTRACT MANAGEMENT IN CONSTRUCTION WORKS” a.a 2022/23   Il presente lavoro di tesi si propone di studiare nel dettaglio l’integrazione della progettazione di edifici in legno nel contesto sempre più rilevante del “Design for Manufacturing and Assembly” (DfMA), tramite lo sviluppo di un […]

Contract, PROJECT MANAGEMENT

IL PROGETTO CITYWAVE

AUTORE: Andrea Zerbini TUTORS: ing. Giovanni Franchi INTERNSHIP: – MASTER:Master in “PROJECT AND CONTRACT MANAGEMENT IN CONSTRUCTION WORKS” a.a 2021/22   Il presente lavoro ha l’obiettivo di descrivere il processo di sviluppo del progetto denominato Citywave all’interno dell’ ambito di riqualificazione urbanistica del PII Citylife. Si tratta di un progetto che prevede la realizzazione di […]

Contract

IL SETTORE DELLE COSTRUZIONI IN ARABIA SAUDITA: UN CASO STUDIO

AUTHOR: Carlo Lillo TUTORS: Giovanni Franchi INTERNSHIP: MASTER: Master in “Contract, Claim, and Delay Management in Construction Works” a.a 2021/2022   Il settore delle costruzioni nel Regno dell’Arabia Saudita riveste un ruolo cruciale nel piano Vision 2030 del paese, che mira a stimolare la crescita economica al di fuori del settore petrolifero. Tuttavia, le controversie […]